On Wed, Jun 14, 2017 at 12:22:53PM +0200, Vít Ondruch wrote:
IMO, the latest package should be always non-versioned one and
versioned
should be only the compat packages.
E.g. the llvm package is always the latest, shipping llvm 4.0 ATM and
llvm3.9 should be compat package, shipping the previous version. Once
new version is released, lets say llvm 5.0, the non-versioned llvm
should be migrated to that version and compat llvm4.0 should be introduced.
All other things aside, this is pragmatically easier, because creating
a new package4 or package5 triggers a new package review.
--
Matthew Miller
<mattdm(a)fedoraproject.org>
Fedora Project Leader