On 5. 4. 2016 at 10:08:20, Kevin Fenzi wrote:
On Tue, 05 Apr 2016 08:27:36 +0200
Jan Zelený jzeleny@redhat.com wrote:
Is there an estimate as to when the tooling (doesn't matter if it's mash or pungi) might be ready? Looking at the IRC log, it doesn't say what is the plan.
I have no idea. :)
The two things that likely should be looked at are pungi and now the signed koji repos (which bodhi/updates are going to switch to before too long from mash).
Are there any resources that might help with this work?
pungi is at: https://pagure.io/pungi
signed repos is still being worked on and will be in koji: https://pagure.io/koji/pull-requests
I will ask around and see what I can do.
Thanks, Jan