https://bugzilla.redhat.com/show_bug.cgi?id=791263
--- Comment #30 from Marcin Zajaczkowski mszpak@wp.pl --- The version is already "feature complete", but there are some continuous delivery related things in progress. I think the first part of September is pretty possible.
1.10.0 is the next version in the 1.x line and is planned to be backward compatible, so if this is not a problem for you to later upgrade 1.9.5 to 1.10.0 in EPEL7 that would be IMHO the best option.