Hi,
To give a concrete example, here is a PR that has been validated by Zuul,
approved by the
package maintainer and published by Zuul on Koji.
https://src.fedoraproject.org/rpms/nodepool/pull-request/6
Four jobs have run to validate the PR (triggered at PR creation/update):
- rpm-scratch-build: Package build as scratch on Koji
- rpm-linter: Run the rpm-lint command on packages built by Koji
- rpm-rpminspect: Run the rpminspect command on packages built by Koji
- rpm-test: Run the included tests/tests.yml functional tests on a Fedora
Rawhide VMs
Then the maintainer, after a look at the test results, flagged the PR with
the 'gateit'
flag to trigger the publication part of the workflow. Then Zuul:
- merged the PR
- run the job rpm-build to build on Koji
More details on this wiki page:
https://fedoraproject.org/wiki/Zuul-based-ci