2012.7 Sprint EOS schedule

Jason Guiditta jguiditt at redhat.com
Fri Jul 13 19:22:36 UTC 2012


On 13/07/12 13:30 -0500, Steve Linabery wrote:
>I would like to propose:
>
>0) Repo freeze on EOD Mon 30-Jul
>1) making it a goal to have spec and cuke unit tests passing on conductor master
If you mean for rpm/distro install of conductor, then agree, if you
mean upstream, I doubt that will happen.  The only tests actively
being fixed right now for that case are the iwhd calls that need to be
stubbed out, others need to be addressed in upcoming sprints.

>2) Branching and tagging 0.12.x release on Wed 1-Aug, or when 1) complete, whichever is earlier.
>
>Does any of that strike anyone as controversial?
>
>Thanks,
>Steve|eggs
>Software Engineer, Red Hat, Inc



More information about the aeolus-devel mailing list