On Sat, Aug 06, 2005 at 01:53:29PM -0400, Dan Williams wrote:
On Fri, 5 Aug 2005, Bryan Stillwell wrote:
> Every once in a while on my internal plague server I get builds that get
> stuck in the state "needsign/in-progress" and never make it into
> "needsign/success". Has anyone else run into this problem?
I think this is an artifact of incorrect ordering of writing status updates to
the database when the job is finished, I'll correct this in CVS shortly.
I've done about 15 builds in a row without running into this problem, so
I consider this to be fixed now as well. Thanks again!
Bryan
--
Aspen Systems, Inc. |
http://www.aspsys.com/
Production Engineer | Phone: (303)431-4606
bryans(a)aspsys.com | Fax: (303)431-7196